HIGH FLOW, HIGH PRESSURE Fitting Line Development

HIGH FLOW, HIGH PRESSURE Fitting Line Development

Development of HIGH FLOW, HIGH PRESSURE Fitting Line We have developed a line of dry break fittings that consist of six sets of fittings with each pair offering a minimum flow area equivalent to 1” schedule 80 pipe. The fittings incorporate the following design...
Who We Are

Who We Are

FloMAX International, Inc. began developing fluid transfer systems in 2002 a division of Edge Technology, a CNC production machine shop.  In September of 2004, we were incorporated as a privately held corporation. FloMAX continues to be fully supported...
Summary of LEAN 5S

Summary of LEAN 5S

1, 2, & 3  – Sort, Set-in-Order, and Shine  — create the new discipline 4 – Standardise — set up to maintain the new baseline 5 – Sustain – respect & self-discipline at the Operator & Maintainer level We clean the area of all unneeded and unused material....
Success in the LEAN Journey

Success in the LEAN Journey

1, 2, & 3  – Sort, Set-in-Order, and Shine  — create the new discipline 4 – Standardise — set up to maintain the new baseline 5 – Sustain – respect & self-discipline at the Operator & Maintainer level We clean the area of all unneeded and unused material....
Mistake Proofing Failsafe AKA: Poke Yoke

Mistake Proofing Failsafe AKA: Poke Yoke

Poke Yoke Mistake-Proofing in the Mining Connector Business   Mistake proofing and making something foolproof is the ultimate goal of a LEAN production system. We want to make our parts, assemblies, and processes in such a manner that is impossible for them to be...